Basement Update

Posted by Jaclyn on May 8th, 2011 filed in Home

We have carpet! 

The basement is nearly complete.  With the exception of a few finishing touches (and some furniture), the basement project is almost done…at least this phase.  We’ve chosen to wait on finishing the bar and the bathroom for now.

Here are some pictures:

Leave a Comment

You must be logged in to post a comment.


Warning: require_once(/home/tonydoffin/thedoffintrips.net/wp-content/themes/diarynotes/footer.php): failed to open stream: Permission denied in /home/tonydoffin/thedoffintrips.net/wp-includes/template.php on line 688

Fatal error: require_once(): Failed opening required '/home/tonydoffin/thedoffintrips.net/wp-content/themes/diarynotes/footer.php' (include_path='.:/usr/local/lib/php:/usr/local/php5/lib/pear') in /home/tonydoffin/thedoffintrips.net/wp-includes/template.php on line 688